Case Study

Concrete Slab and Driveway Construction in Redlynch

Project Type Concreting
Project Status Completed
Completed by Cairns Precision Earthworks
Location Redlynch

Transformation

From a bare cut batter to a new parking slab and driveway.

Completed exposed aggregate parking slab beside the excavated bank in Redlynch
Steel reinforcing mesh laid over membrane against an excavated batter in Redlynch
Before After
New parking slab against the excavated batter

Project Brief

The property in Redlynch needed a concrete slab and driveway for parking, and there was nothing in place to start with. The owner wanted a dedicated space to park and durable access up from the street. The site sloped and access was tight, so a standard truck pour wasn't going to reach the work area.

We started with site preparation and earthworks. That meant cutting into the batter to open up a level area for the slab. The excavated soil and rock face sat right behind where the slab would go, so we planned for a retaining connection into it.

Once the ground was ready, we laid a waterproof membrane and set out the steel reinforcing mesh. We tied capped starter bars along the perimeter and along the rock and soil face so the slab would tie into the bank. With access limited, the concrete was pumped from the street. You can see the pump truck at street level in the photos while the pour was going on.

We poured, screeded and finished the slab. Part of the surface was finished with an exposed aggregate, so you can see the stones in it. The rest was trowelled to a smooth finish. We also poured around 80 metres of new concrete driveway to give access from the street up to the parking area. Careful planning kept the pour moving on a site that wasn't easy to work.

The finished slab sits against the cut batter with the retaining connection in place. The exposed aggregate section came up with a clean, textured surface. It's solid, workable concrete that gives the property a parking space and proper access where there was none before.

What was included

  • Site preparation and earthworks into the cut batter
  • Laid waterproof membrane and set steel reinforcing mesh
  • Tied capped starter bars along the perimeter and rock face for a retaining connection
  • Pumped concrete to reach the work area due to limited access
  • Poured, screeded and finished the parking slab
  • Poured around 80 metres of new concrete driveway
  • Exposed aggregate and smooth trowelled finishes

Key Features

Exposed aggregate finish

Part of the slab was finished with exposed aggregate, with the stones left visible in the surface.

Retaining connection into the batter

Capped starter bars were tied along the excavated rock and soil face to tie the slab into the bank.

Pumped concrete

With tight access, the concrete was pumped from the street up to the work area.

The Result

The property now has a new concrete parking slab and around 80 metres of driveway where there was none before. The slab ties into the cut batter, and the exposed aggregate section has a clean, textured surface. It's strong, long-lasting concrete that improves access and usability for the property in Redlynch.

Suburb
Redlynch
Job type
Concreting
Completed
January 30, 2026

© Cairns Precision Earthworks Pty Ltd 2026

Website & SEO by SoDutch Web Design & SEO