Case Study

Plunge Pool Concrete Slab in Mooroobool

Project Type Concrete slab
Project Status Completed
Completed by Cairns Precision Earthworks
Location Mooroobool

Transformation

From stripped-back ground to a level, reinforced slab ready for a plunge pool.

Project Brief

A residential property in Mooroobool needed a solid base for a new plunge pool. A pool holds a lot of weight once it's filled, so the ground had to be able to carry the load without moving. That meant getting the excavation and compaction right before any concrete went down.

We stripped back the existing ground and excavated to depth. From there we laid a compacted road base foundation to build up the load-bearing capacity. Cairns gets heavy rainfall and the soil here is reactive, so compaction and drainage were the parts we couldn't cut corners on.

Once the base was set, we boxed the slab with timber formwork. We set the steel reinforcement, then poured to precise levels so the plunge pool would sit square and structurally sound. Getting the levels right at this stage saves a lot of grief later when the pool goes in.

The slab sits beneath the elevated timber house, next to the existing brick-paved area. Along one edge, where the slab meets the paving, we ran a drainage channel with a metal grate. That takes water away during the wet season and keeps it off the slab.

The surrounding ground was left stripped back and levelled around the finished concrete. It's straightforward earthworks and concrete work, but the prep underneath is what makes it last.

We do the same groundwork on jobs like our concrete sleeper retaining wall in Bentley Park, where compaction and drainage decide how well the finished work holds up over time. Far North Queensland conditions are hard on anything that isn't built for them.

What was included

  • Excavated and stripped back the existing ground to depth
  • Installed a compacted road base foundation for load-bearing capacity
  • Boxed the slab with timber formwork
  • Set steel reinforcement through the slab
  • Poured the concrete to precise levels
  • Installed a drainage channel with metal grate along the slab edge

Key Features

Compacted road base foundation

We excavated and laid a compacted road base to build a stable base capable of carrying the pool when filled.

Reinforced, level slab

The slab was steel reinforced and poured to precise levels so the plunge pool sits square and structurally sound.

Wet-season drainage

A drainage channel with a metal grate runs along the edge where the slab meets the paving, taking water away during heavy rain.

The Result

The finished slab sits level and square beneath the elevated house, next to the existing brick paving. With the road base, steel reinforcement and edge drainage in place, it's a strong foundation built for the plunge pool and for Far North Queensland's wet season.

Suburb
Mooroobool
Job type
Concrete slab
Completed
February 19, 2026

© Cairns Precision Earthworks Pty Ltd 2026

Website & SEO by SoDutch Web Design & SEO