Transformation
From cleared, uneven ground to a level poured carport slab.
Project Brief
The homeowner in Edge Hill needed a solid, all-weather parking space for a carport. The ground behind the two-storey home was uneven, with grass and soft soil that wouldn't hold a slab on its own. That meant full site prep before any concrete went down.
We started by stripping back the surface and clearing the vegetation. There was stacked timber and general clutter across the yard to deal with first. Once the area was clear, we excavated to the required depth.
Next came the foundation. We installed a compacted road base to give the slab long-term stability on the soft ground. Getting the base right is what stops movement later on.
Edge Hill gets heavy rain through the wet season, so drainage and fall mattered here. We set the fall carefully so water runs off rather than pooling against the slab or the house.
With the base and fall sorted, we boxed the area, laid the reinforcement, and poured. The slab sits against the rear of the home, so we worked to a clean edge along the wall. The result is a large, level surface built to take vehicle loads and everyday use.
Once the pour had set, we cleaned the surface down with a leaf blower to clear off any loose debris. The surrounding earth was still disturbed at that point and left to be tidied up.
It's straightforward work, but a proper base and the right fall make all the difference on a site like this. We do the same across Edge Hill, Whitfield, Brinsmead and greater Cairns. If you've got earthworks that lead into concrete, take a look at our other projects around the Cairns region.
What was included
- Cleared vegetation and stacked material from the site
- Stripped the surface and excavated to depth
- Installed a compacted road base foundation
- Set the fall for wet season drainage
- Boxed and reinforced the slab area
- Poured a large, level concrete slab against the rear of the home
- Cleaned the finished surface down
Key Features
Compacted road base
We laid a compacted road base under the slab to give it long-term stability on the soft, uneven ground.
Drainage and fall
With Edge Hill's heavy wet season rain, we set the fall so water runs off the slab rather than pooling.
Reinforced pour
The slab was boxed and reinforced before the pour to handle vehicle loads and everyday use.
The Result
The finished slab is a large, level concrete surface at the rear of the two-storey home, ready for a carport. It gives the homeowner a durable, all-weather parking space on ground that was soft and uneven before we started.
- Suburb
- Edge Hill
- Job type
- Concrete slab
- Completed
- February 19, 2026
Get started
Planning your own concrete slab?
Need a concrete slab or earthworks done in Cairns? Get in touch for a quote.
Get a quote
Next Project
Site Preparation on a Sloped Block in Kanimbla
View project →